News Flash

Home

5 Stories
Posted on: April 17, 2019

ROAD CLOSING PHASE 1 STEP 2 HICKORY STREET FROM MIMOSA TO WALNUT

P R E S S R E L E A S E

NOTICE TO THE GENERAL PUBLIC OF IMPENDING ROAD CLOSINGPHASE 1 STEP 2 HICKORY STREET FROM MIMOSA TO WALNUT

Work on the West side of Hickory Street in the 100 block has reached a point where it becomes necessary for the contractor to m...

Read on...

Home
Posted on: March 22, 2019

ROAD CLOSING PHASE 1 STEP 1 HICKORY STREET FROM OLEANDER TO WALNUT

P R E S S    R E L E A S E

   NOTICE TO THE GENERAL PUBLIC OF IMPENDING ROAD CLOSING

PHASE 1 STEP 1 HICKORY STREET FROM OLEANDER TO WALNUT

Work on the underground piping and services in all three blocks of Hickory Street f...

Read on...

Home
Posted on: March 21, 2019

PROPOSED FLOOD HAZARD DETERMINATIONS

AN INVITATION TO THE GENERAL PUBLIC TO PROVIDE SCIENTIFIC OR TECHNICAL INFORMATION AND/OR COMMENTS ON PROPOSED FLOOD HAZARD DETERMINATIONS SHOWN ON AVAILABLE PRELIMINARY FLOOD INSURANCE RATE MAP (FIRM) AND FLOOD INSURANCE STUDY REPORT (FIS) DURING THE 90-...

Read on...

Home
Posted on: February 5, 2019

Conceptual Design for Phase 3 of Downtown Revitalization

Engineers from Kimley-Horn have submitted the attached conceptual design for Phase 3 of the Downtown Revitalization. This is only considered the 30% stage of the design phase, so the engineers are taking the feedback they have received from stakeholders a...

Read on...

Home
Posted on: January 24, 2019

NOTICE TO THE GENERAL PUBLIC OF IMPENDING ROAD WORK STARTUP PAVING, DRAINAGE & UTILITY IMPROVEMENTS

  NOTICE TO THE GENERAL PUBLIC OF IMPENDING ROAD WORK STARTUP  

PAVING, DRAINAGE & UTILITY IMPROVEMENTS ON SOUTH YAUPON ST (WALNUT TO OLEANDER), OLEANDER ST (HICKORY TO MAPLE), HICKORY ST (MIMOSA TO OLEANDER), LOTUS ST (HICKORY TO PAS...

Read on...

Home